日韩精品午夜理论片在线观看,一区二区日韩国产精品,色偷偷亚洲综合网亚洲,国产精品日韩欧美久久综合,999视频精品全部免费观看,国产一级a毛一级a看免费视频,日本视频国产在线,国产在线视频毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

PRODUCT

BZ70

BZ70 Hydraulic walking pile frame is our heavy
equipment which is integrated by mechanical,
electrical and hydraulic systems. It is specially
made for SMW(Soil Mixing Wall) construction.
As a 70 tons grade pile frame, this type machine
integrated by new hydraulic system is developed
from our JB series Hydraulic walking pile
frame technology and construction experience
through improved quality and performance. This
equipment not only can be hung with SMW multishafts
drilling machines, but also can be used in
other foundation construction projects. So this high
performance model machine is a multi-functional
equipment to work in foundation projects, such as
bridges, harbors and diaphragm walls.

 

type

BZ70

Total leader length (m) 21-39
Adjustment range of leader angle(side) (°)  before and after (°) ±1.5
    left and right (°) ±1.5
  Earth auger
Hydraulic winch (earth auger)  /Single pull (max KN) 91.5
 Speed (m/min) 0-26
Hydraulic winch
(erection,drill stem)
 Single pull(max kn) 68
 Speed (m/min) 0-32
Vertical track  Speed (m/min) <2.7
 Step (mm) 800
  length (mm) 6900
 Width (mm) 1700
Cross track  Speed  (m/min) <4.5
 Step (mm) 3100
 length (mm) 9500
 Width (mm) 1200
Swing angle of platform(°) ±10
Lift Speed (m/min) <0.55
Lift Height (mm)( mm) 450
Average ground pressure (Mpa) ≤0.1
Pressure of hydraulic system (Mpa) 25/20
Control mode of hydraulic system electric control
weight (t) ≈130