日韩精品午夜理论片在线观看,一区二区日韩国产精品,色偷偷亚洲综合网亚洲,国产精品日韩欧美久久综合,999视频精品全部免费观看,国产一级a毛一级a看免费视频,日本视频国产在线,国产在线视频毛片

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

SG40A construct in PuDong century avenue

2009-05-27

In May, 2009, all projects of 2010 Shanghai Expo have been in the last stage. Recently, Our SG40A has successfully constructed in PuDong century avenue project. It received the praise from the general contractor and machine user.


 


This project is a complicated one, located in Pudong district, it includes 2 buildings of parking lot (33 floors overground and 4 floors underground ), covering 200000 m2. The geological conditions are complicated, 0-20m is fill in soil, 20-28m is fine clay, 28-38 is fine arenaceous sand, 38-66m is fine sand. The wall is 1.2m width and 52m depth.

 Considering the construction difficulty for this project and lower efficiency if dig directly, so the worker use the “two drills and one dig” method to dig the wall according to the experience. In the starting stage, the contractor use the famous German brand machine to dig the wall, but it performs not good, it would have to finish a 6m length wall in 2 or 3 days. In the Feb of this year, our Jintai SG40A entered the jobsite, and finished a wall with 26 hours and lower 3‰precision. After successfully finished some walls , this machine SG40A got the praise from the user and contractor with lower cost, easy maintenance, and high efficiency, so the contractor introduced one SG40A again and let the foreign brand wall machines out of the jobsite.

Till now, SG40A have worked in the jobsite for 3 months, they have worked very well and impressed the user very much. We are proud that our SG40A have provide the good service to the Expo projects and ensure the project to be finished in time. These machines have left us a glorious time for the expo projects.